top of page

Key Milestone

OCT 2021

SEP 2021

JUN 2021

APR 2021

JUN 2021

unnamed (2).png
Screenshot 2021-12-04 at 10.55.41 PM.png
unnamed (2).png
picture.png
PA logo.png

DEC 2020

OCT 2020

JUN 2020

FEB 2020

JAN 2020

images.png
image_1530774470-9dc231209e.jpg
takenaka-logo.png
takenaka-logo.png

AUG 2019

JUL 2019

JUL 2018

JUN 2018

MAY 2018

picture.png

FEB 2018

takenaka-logo.png

DEC 2017

OCT 2017

takenaka-logo.png

AUG 2017

APR 2017

takenaka-logo.png
1603280104China_Railway_Construction_Corporation.png
daewooeccl.jpg
Samsung_Logo.svg.png
uesh_logo.png

MAR 2017

JUN 2016

download (4).png

APR 2016

download (1).jpeg

MAR 2016

OCT 2015

kjmlogo4-b_c.gif

AUG 2015

Samsung_Logo.svg.png

MAY 2015

takenaka-logo.png

FEB 2015

🎉

download (2)_edited.jpg
download (2)_edited.jpg
image_readtop_2021_430968_16201099264633837.jpg
Screenshot 2021-12-12 at 5.15.59 PM.png
Screenshot 2021-12-12 at 5.14.52 PM.png

Award GS Contract T301 construction of 4-in-1 rail and bus depot and reception tunnels for Thompson-East coast line - misc rc works 

Proposed Addition & Alteration Works to the Existing 3-Storey Detached Dwelling House with Swimming Pool at 178 Coronation Road West, Singapore 269387

Building RC&PC Installation Work Package A (Administration & OCC Building) @ C190 ITTC PROJECT

Design And Construction of Sewer Tunnels For The Deep Tunnel Sewerage System Phase 2 Project - Contract T-07 @ P-DC1, P-LS1 and X1-LS2 at Jin Bahar

Proposed Demolition For Proposed Erection of 2 Units of 3-Storey Envelope Control Detached Dwelling Houses Each With A Basement And Swimming Pool MK04 on Lots 05485L, 05486C At 51 Jalan Ampang, 49 Jalan Ampang Singapore 268637&268635(Bukit Timah Planning Area)

Proposed Addition And Alteration Works To Singapore Land Towers

Proposed New Erection of A 2 Storey Detached Dwelling House With And Attic and Swimming Pool On Lot 01171T, MK 04 96B Coronation Road West, Singapore 269319 (Bukit Timah Planning Area)

Proposed Erection Of Integrated Waste Management Facility And Ancillary Buildings On Lot 05036W Mk 07 Off Tuas South Lane/Tuas South Ave 9  - Temporary Container Site Office & CTQ

Proposed New Erection Of 2-Storey Envelope Control Detached Dwelling Houses With Basement And Attic On Lot 09629N Mk 17 At 18 Camden Park (Novena Planning Area)

Proposed Additions And Alterations To Existing Hangi Airport Terminal 2 On Basement, 1St Storey To 5Th Storey Including A New 3-Storey Early Baggage Store (Ebs) Extension And A New 4-Storey Ancillary Office Block On Lot 04596M Mk 31 At 60 Airport Boulevard (Changi Planning Area)

GCB A&A works @ 18 Ewart Park

Proposed A&A 2 Basement Medical Facilities and Ancillary Works Hospital at Mount Elizabeth Novena 

T222 Outram Park Station and Tunnels for Thomson-East Coast Line Shaft RC works

Moved to Oxley Building 

JIST Project at 120A Banyan Drive 

Construction traffic diersion works and external works for C885 Prince Edward Station 

Proposed Development of Changi East - Package 1

Sumitomo Warehouse Extension Project at 8 Tuas Ave 5 

T216 Steven station Cp2 & Cp2a shaft and entrance B RC work 

Process Addition And Alteration Works To Existing Single-User Factory Building On Mk 07 Lot 0244P At No 1 Tuas Road (Sony)

Civil & Structural works for pipework and Trench Works / External Works (Cable Pipesleeves, Retaining Wall and Miscellaneous Works) at Chestnut Avenue Waterworks 

MRT C928 Bedok Town Park Station External Works

EW2 Shaft 28 Dunearn Road RC WORKS

Moved to the 1st office at Pioneer Rd North

A&A works at 6 Shenton Way 

Labour supply for downtown line c923 upper Changi station RC work 

Changi T1 A&A BUS GATE RC structure & Wet trade works 

Company Register

bottom of page